Alpine skiing
Add news
In brief

Cableway of National Alpine Skiing Center fully connected, ready to go

0 6

BEIJING, Aug. 14 (Xinhua) -- The cableway linking Yanqing Olympic Village of Beijing 2022 and various areas of the National Alpine Skiing Center is now fully connected and capable of operation, according to manufacturers Beijing Enterprises Group.

The cableway system is equipped with nine overhead cableways and two traction cableways, with a total length of about 10.3 kilometers. Among them, the main line cablew

Загрузка...

Comments

Комментарии для сайта Cackle
Загрузка...

More news:

«Albany Democrat Herald» (democratherald.com)
«Albany Democrat Herald» (democratherald.com)
«Albany Democrat Herald» (democratherald.com)

Read on Sportsweek.org:

Oann.com (One America News Network)
Oann.com (One America News Network)
Avax.news
Avax.news

Other sports

Sponsored