Stadium repairs (11 replies)
0
33
Now they appear to be underway at last with the seat removal, and in the hope that someone at the club reads this site, it’d be great, and much needed, PR if they’d post a daily photographic diary somewhere as the works progress.
I know it’s only preparatory works that are being done over the World Cup shut down, but from what l think l’ve read it includes ripping up the concrete terraces and then leaving them safe for the resumption before the main reconstruction next summer.
I know it’s only preparatory works that are being done over the World Cup shut down, but from what l think l’ve read it includes ripping up the concrete terraces and then leaving them safe for the resumption before the main reconstruction next summer.

